Components in the fabric have high leakage current and require special handling of the equipment-grounding (earthing) conductor. The safety ground is provided in the power cord. There are no special grounding requirements unless the LC1-UVH power cord is chosen. If this power cord is chosen, the termination must be completed by a qualified electrician, and comply with all national and local standards and codes.