Prepare your site for the delivery and installation of the ClearPath Forward fabric hardware. The site must comply with local and national building, electrical, and safety codes and with all requirements of authorities that exercise jurisdiction in the area of the installation site. The site must also comply with all current applicable standards of the National Fire Protection Association (NFPA) or equivalent governing requirements in the country where the hardware is to be installed. Your site should comply with any local regulations that specify more stringent requirements.
This section contains electrical, environmental, and physical specifications for the fabric hardware. Specific information about peripherals that can be connected to the fabric is not included; for details on peripherals, refer to the documentation provided for those devices.
Description of Unisys and customer responsibilities when preparing the site | |
Requirements for physical ease of access during hardware installation | |
Considerations for planning the fabric layout | |
Requirements for physical ease of access during hardware servicing or maintenance | |
Minimum and maximum hardware configuration layouts in the cabinet | |
Plan your site to accommodate the cabinet footprint | |
Possible placement of hardware with expansion cabinets | |
Requirements for AC entrance, mating receptacle, and power cords | |
Requirements for equipment grounding | |
Requirements for signal reference connections | |
Considerations for backup power supply | |
Operating and storage temperature, relative humidity, vibration, shock, and altitude | |
Requirements for air-conditioning capacity | |
System configurations are designed to meet electromagnetic field emission limits | |
Dimensions, weight, and power supply ratings for the cabinet and each cabinet component | |
Requirements for fabric hardware cabling | |
Considerations when making final preparations for hardware installation | |
Time required before unpacking your cabinet (due to ambient shipping temperature) | |
List of hardware you need to supply |