Physical Requirements

Prepare your site for the delivery and installation of the ClearPath Forward fabric hardware. The site must comply with local and national building, electrical, and safety codes and with all requirements of authorities that exercise jurisdiction in the area of the installation site. The site must also comply with all current applicable standards of the National Fire Protection Association (NFPA) or equivalent governing requirements in the country where the hardware is to be installed. Your site should comply with any local regulations that specify more stringent requirements.

This section contains electrical, environmental, and physical specifications for the fabric hardware. Specific information about peripherals that can be connected to the fabric is not included; for details on peripherals, refer to the documentation provided for those devices.

Site Preparation and Planning Responsibilities

Description of Unisys and customer responsibilities when preparing the site

Equipment Access

Requirements for physical ease of access during hardware installation

Layout and Weight Considerations

Considerations for planning the fabric layout

Service Access

Requirements for physical ease of access during hardware servicing or maintenance

Cabinet Layouts and Power Requirements

Minimum and maximum hardware configuration layouts in the cabinet

Cabinet Footprint

Plan your site to accommodate the cabinet footprint

Hardware Footprint

Possible placement of hardware with expansion cabinets

AC Entrance Requirements

Requirements for AC entrance, mating receptacle, and power cords

Grounding Requirements

Requirements for equipment grounding

Signal Reference Connection Requirements

Requirements for signal reference connections

Uninterruptible Power Supply

Considerations for backup power supply

Environmental Requirements

Operating and storage temperature, relative humidity, vibration, shock, and altitude

Air-Conditioning Load

Requirements for air-conditioning capacity

Electromagnetic Field Emissions Specifications

System configurations are designed to meet electromagnetic field emission limits

Physical Specifications

Dimensions, weight, and power supply ratings for the cabinet and each cabinet component

Cabling Requirements

Requirements for fabric hardware cabling

Site Readiness

Considerations when making final preparations for hardware installation

Cabinet Acclimatization

Time required before unpacking your cabinet (due to ambient shipping temperature)

Customer-Supplied Hardware

List of hardware you need to supply